Overview

230 units of air-conditioning from 1.5hp to 5.0hp valued about RM1.5million were replace at the main intake substation (PMU) Kelantan, Terengganu, Johor, Perak, Kedah & P.Pinang. The PMU areas covered were PMU Kota Setar (Kedah), PMU Gelugor (P.Pinang), PMU Kuala Kangsar (Perak), PMU Rengit (Johor), PMU Dungun (Terengganu) and PMU Pasir Puteh (Kelantan).

Client:
TENAGA NASIONAL BERHAD
Duration:
November 2020 - November 2021
Services:
Kerja-kerja Merombak, Membekal, Memasang dan Memulatugas Sistem Penghawa Dingin (PMU) untuk Mainhead 1,2,3,6,8 & 9 (Kelantan, Terengganu, Johor, Perak, Kedah & P.Pinang)
Client Website:
www.tnb.com.my/

Challenge

Having difficulty in installing air-conditioning in some PMU areas because of narrow and high areas. Installing an air conditioner in the proper way and right position is increasingly important as it has a significant impact on its energy efficiency.

Solution

Make sure all the technician wear safety equipment such as safety harness, safety helmet and safety boot to prevent any on-site incident. We also established a collective protective measures covering numbers of employees in a workplace must have priority over protective measures applying to individual employees.

Results

We successfully complete all the installation with no on-site injury and all the air-conditioners installed were function well.